SUB MENU
How to Guides
How-To-Guides/Guidelines
- Building (How-To-Guides)
- BPG-240 Annual Facility Permit
- BPG-239 Express Building Plan Review Building Permit Guide.pdf
- BPG-238 Temporary Power Poles.pdf
- BPG-235 DAIR Building Permit Guide 07.10.2024.pdf
- BPG-232 Fence - Block Wall Effective -Revised 10-04-22
- BPG-216 Wind Generators Effective Date 02-17-2017
- BPG-202 Vehicle Body Shop Effective Date 02-17-2017.pdf
- BPG-201 Unique Interiors Effective Date 02-17-2017.pdf
- BPG-192 Temporary Off-Premise for Sale Effective Date 02-17-2017
- BPG-188 Spray Finishing Operations Effective Date 02-17-2017.pdf
- BPG-186 Standard Plan Process for Residential Development Effective Date 02-17-2017
- BPG-185 Swimming Pool-Spa and Water Feature Effective Date 02-17-2017
- BPG-184 Load Bearing and Non-Load Bearing Straw Bale Construction Effective Date 02-17-2017.pdf
- BPG-182 Single Family Residence & Guest House Effective Date 02-17-2017
- BPG-181 Shell Building Effective Date 04-21-2023
- BPG-173 Residential Homeowner Guideline for Final Inspections Effective Date 02-17-2017
- BPG-172 Residential Room Additions Effective Date 02-17-2017
- BPG-171 Reciprocal Easement Agreement Effective Date 02-17-2017.pdf
- BPG-161 Quality Assurance Agency Selection Effective Date 02-17-2017
- BPG-155 Post Construction Permits Effective Date 02-17-2017
- BPG-154 Plumbing Service & Repair - No Permit Required Effective Date 02-17-2017
- BPG-153 Plumbing License Requirements Effective Date 02-17-2017
- BPG-152 Phased Design Buildings Effective Date 02-17-2017.pdf
- BPG-133 35 Decibel Level Reduction Standard Effective Date 02-17-2017.pdf
- BPG-132 30 Decibel Level Reduction Standard Effective Date 02-17-2017.pdf
- BPG-131 25 Decibel Level Reduction Standard Effective Date 02-17-2017.pdf
- BPG-126 Moved Residential Building Effective Date 02-17-2017
- BPG-125 Modular Building as a Single Family Residence Effective Date 02-17-2017
- BPG-124 Mobile Home Park Effective Date 02-17-2017
- BPG-123 Estates and Privately Deeded Property Effective Date 02-17-2017
- BPG-122 Mobile Home Conversion from Personal to Real Property Effective Date 02-17-2017
- BPG-121 Master Egress Plan Effective Date 02-17-2017.pdf
- BPG-120 Manufactured Building on Commercial Property Effective 02-17-2017
- BPG-083 Implosion Demolition Effective Date 02-17-2017
- BPG-082 In-Facility Plan Review Effective Date 02-17-2017.pdf
- BPG-081 IECC Submittal Requirements Effective 02-17-2017.pdf
- BPG-063 Natural Gas & LPG Testing Requirements Effective Date 02-16-2017
- BPG-062 Grading Permit Effective Date 02-16-2017
- BPG-061 Grading in Conjunction with a Residential Subdivision or Parcel Map Effective Date 02-16-2017
- BPG-053 Fire Proofing for Steel Construction Effective Date 02-16-2017.pdf
- BPG-052 Fire Protection Report Design Effective Date 02-16-2017.pdf
- BPG-043 Engineered Wood Trusses Effective Dates 02-16-2017.pdf
- BPG-026 Conversion of Single Family Dwelling to Office Building Effective Date 02-16-2017
- BPG-025 Complex Facilities Effective Date 02-16-2017
- BPG-024 Commercial , Industrial & Multi- Family Development Effective Date 02-16-2017
- BPG-023 Tenant Improvement for Commercial Building Effective Date 02-16-2017
- BPG-022 Combined Board of Building Appeals Guideline Effective Date 02-16-2017.pdf
- BPG-021 Combined Board of Building Appeals Guidelines for Preparing Appeals Effective Date 02-16-2017.pdf
- BPG-003 Amusement & Transportation System Building Permit Guide Effective Date 02-16-2017
- BPG-002 Alternate Materials & Methods of Construction Effective Date 02-16-2017.pdf
- A - Temporary Sales Office Conversion to Garage Guide 12-15-2020.pdf
- Fire (Guidelines)
- Water Tanks for Private Fire Protection per NFPA 22 updated 03-11-21
- Waste Handling
- Vehicle Permit (Liquid or Gas Fueled Vehicles in Assembly Buildings)
- Underground Fire Services Main, Fire Hydrants and Fire Access
- Traffic Calming Devices
- Tenant Improvement Sprinkler per NFPA 13 updated 03-11-21
- Temp. and Perm. Generators
- Stop Work Order
- Standard Sprinkler System Plans - Letter
- Sprinkler System - Express Reviews for Simple Revisions and Resubmittals
- Sprinkler per NFPA 13R updated 03-11-21
- Sprinkler per NFPA 13
- Special Activity Lots - Temporary
- Smoke Removal Control Panel
- Smoke Control Panel
- Repair Garages
- Proprietary (Self) Monitoring
- Pressure Reducing Valves Testing
- Places of Assembly, Annual Renewable
- Permit by Inspection for up to Five Displayed Vehicles
- Pallets - Exterior Storage of Pallets Accessory to Occupancy's
- Pallets - Exterior Storage for Commercial Pallet Yards
- Open Flame Devices for Decorative Food Preparation
- Open Burning
- New Work in Existing Buildings
- Motor Vehicle Fuel Dispensing
- Liquefied Petroleum Gas
- Industrial Ovens
- In-Building Riser - NFPA 24
- Hydrant Flow Test, Sprinkler Design
- Hot works Operations Non-Renewable (6 Months or Less)
- Hot Works Operations - Renewable
- High Piled Combustible Storage
- Foam Suppression Systems
- Foam - Water Sprinkler and Foam - Water Spray Systems
- Flame Effects, Fire Performer
- Flam-Comb Liquids Operations or for Storage or Use
- Fire Standpipe per NFPA 14
- Fire Sprinkler - NFPA 13R
- Fire Pump per NFPA 20 updated 03-11-21
- Fire Alarm Systems, Video Detectors
- Fire Alarm per NFPA 72
- Fire Alarm Express Reviews for Simple Revisions and Resubmittals
- Fire Alarm - Ten devices or less - updated 03-11-21
- Fire Alarm - Monitoring Letter - updated 03-11-21
- Fire Alarm - Letter of Intent 4 devices or less
- Express Sprinkler Plan Review
- Exhibits and Trade Shows
- Emergency Responder Radio Coverage System
- Elevator Recall
- Custom Home Sprinklers and Fire Flow
- Commercial Cooking Automatic Extinguishing System
- Combustible Fibers
- Clean Agent Systems
- Carbon Dioxide in Cultivation Facilities
- Carbon Dioxide for Beverage Dispensing
- Candles and Open Flames
- Adding or Re-locating Up to Four Sprinklers
- Access Gates - Automatic