SUB MENU
How to Guides
How-To-Guides/Guidelines
- Building (How-To-Guides)
- 25 Decibel Level Reduction Standard Effective Date 02-17-2017 BPG-131
- 30 Decibel Level Reduction Standard Effective Date 02-17-2017 BPG-132
- 35 Decibel Level Reduction Standard Effective Date 02-17-2017 BPG-133
- Alternate Materials & Methods of Construction Effective Date 02-16-2017 BPG-002
- Amusement & Transportation System Building Permit Guide Effective Date 02-16-2017 BPG-003
- Annual Facility Permit BPG-240
- Combined Board of Building Appeals Guidelines for Preparing Appeals Effective Date 02-16-2017 BPG-021
- Combined Board of Building Appeals Guideline Effective Date 02-16-2017 BPG-022
- Commercial, Industrial & Multi - Family Development Effective Date 02-16-2017 BPG-024
- Complex Facilities Effective Date 02-16-2017 BPG-025
- Conversion of Single Family Dwelling to Office Building Effective Date 02-16-2017 BPG-026
- DAIR Building Permit Guide 07.10.2024 BPG-235
- Engineered Wood Trusses Effective Dates 02-16-2017 BPG-043
- Estates and Privately Deeded Property Effective Date 02-17-2017 BPG-123
- Express Building Plan Review Building Permit Guide.BPG-239
- Fence - Block Wall Effective BPG-232 -Revised 10-04-22
- Fire Proofing for Steel Construction Effective Date 02-16-2017 BPG-053
- Fire Protection Report Design 2025 BPG-052
- Grading Permit Effective Date 02-16-2017 BPG-062
- Grading in Conjunction with a Residential Subdivision or Parcel Map Effective Date 02-16-2017 BPG-061
- Implosion Demolition Effective Date 02-17-2017 BPG-083
- In-Facility Plan Review Effective Date 02-17-2017 BPG-082
- IECC Submittal Requirements Effective 02-17-2017 BPG-081
- Load Bearing and Non-Load Bearing Straw Bale Construction Effective Date 02-17-2017 BPG-184
- Master Egress Plan Effective Date 02-17-2017 BPG-121
- Manufactured Building on Commercial Property Effective 02-17-2017 BPG-120
- Mobile Home Conversion from Personal to Real Property Effective Date 02-17-2017 BPG-122
- Mobile Home Park Effective Date 02-17-2017 BPG-124
- Moved Residential Building Effective Date 02-17-2017 BPG-126
- Modular Building as a Single Family Residence Effective Date 02-17-2017 BPG-125
- Natural Gas & LPG Testing Requirements Effective Date 02-16-2017 BPG-063
- Phased Design Buildings Effective Date 02-17-2017 BPG-152
- Plumbing Service & Repair - No Permit Required Effective Date 02-17-2017 BPG-154
- Plumbing License Requirements Effective Date 02-17-2017BPG-153
- Post Construction Permits Effective Date 02-17-2017 BPG-155
- Quality Assurance Agency Selection Effective Date 02-17-2017 BPG-161
- Reciprocal Easement Agreement Effective Date 02-17-2017 BPG-171
- Residential Homeowner Guideline for Final Inspections Effective Date 02-17-2017 BPG-173
- Residential Room Additions Effective Date 02-17-2017 BPG-172
- Shell Building Effective Date 04-21-2023 BPG-181
- Single Family Residence & Guest House Effective Date 02-17-2017 BPG-182
- Spray Finishing Operations Effective Date 02-17-2017 BPG-188
- Standard Plan Process for Residential Development Effective Date 02-17-2017 BPG-186
- Swimming Pool-Spa and Water Feature Effective Date 02-17-2017 BPG-185
- Temporary Off-Premise for Sale Effective Date 02-17-2017 BPG-192
- Temporary Power Poles BPG-238
- A - Temporary Sales Office Conversion to Garage Guide 12-15-2020
- Tenant Improvement for Commercial Building Effective Date 02-16-2017 BPG-023
- Unique Interiors Effective Date 02-17-2017 BPG-201
- Vehicle Body Shop Effective Date 02-17-2017 BPG-202
- Wind Generators Effective Date 02-17-2017 BPG-216
- Fire (Guidelines)
- Adding or Re-locating Up to Four Sprinklers
- Access Gates - Automatic
- Candles and Open Flames
- Carbon Dioxide in Cultivation Facilities
- Carbon Dioxide for Beverage Dispensing
- Clean Agent Systems
- Combustible Fibers
- Commercial Cooking Automatic Extinguishing System
- Custom Home Sprinklers and Fire Flow
- Elevator Recall
- Emergency Responder Radio Coverage System
- Express Sprinkler Plan Review
- Exhibits and Trade Shows
- Fire Alarm Express Reviews for Simple Revisions and Resubmittals
- Fire Alarm per NFPA 72
- Fire Alarm Systems, Video Detectors
- Fire Alarm - Letter of Intent 4 devices or less
- Fire Alarm - Ten devices or less - updated 03-11-21
- Fire Alarm - Monitoring Letter - updated 03-11-21
- Fire Pump per NFPA 20 updated 03-11-21
- Fire Standpipe per NFPA 14
- Fire Sprinkler - NFPA 13R
- Flam-Comb Liquids Operations or for Storage or Use
- Flame Effects, Fire Performer
- Foam Suppression Systems
- Foam - Water Sprinkler and Foam - Water Spray Systems
- Hydrant Flow Test, Sprinkler Design
- Hot works Operations Non-Renewable (6 Months or Less)
- Hot Works Operations - Renewable
- High Piled Combustible Storage
- Industrial Ovens
- In-Building Riser - NFPA 24
- Liquefied Petroleum Gas
- Motor Vehicle Fuel Dispensing
- New Work in Existing Buildings
- Open Burning
- Open Flame Devices for Decorative Food Preparation
- Pallets - Exterior Storage of Pallets Accessory to Occupancy's
- Pallets - Exterior Storage for Commercial Pallet Yards
- Permit by Inspection for up to Five Displayed Vehicles
- Places of Assembly, Annual Renewable
- Pressure Reducing Valves Testing
- Proprietary (Self) Monitoring
- Repair Garages
- Smoke Removal Control Panel
- Smoke Control Panel
- Special Activity Lots - Temporary
- Sprinkler per NFPA 13R updated 03-11-21
- Sprinkler per NFPA 13
- Standard Sprinkler System Plans - Letter
- Sprinkler System - Express Reviews for Simple Revisions and Resubmittals
- Stop Work Order
- Temp. and Perm. Generators
- Tenant Improvement Sprinkler per NFPA 13 updated 03-11-21
- Traffic Calming Devices
- Underground Fire Services Main, Fire Hydrants and Fire Access
- Vehicle Permit (Liquid or Gas Fueled Vehicles in Assembly Buildings)
- Waste Handling
- Water Tanks for Private Fire Protection per NFPA 22 updated 03-11-21