SUB MENU
Library
Building
Effective October 16, 2023, all new building permit applications will be required to demonstrate compliance with the 2021 IECC.
Effective February 4, 2019, the Clark County Building Department adopted the 2018 International Building Codes. All permit applications (except standard plans) filed from this date forward must adhere to the 2018 Building Codes. Below are local amendments to the adopted codes.
Fire
On January 22, 2019 the Board of Clark County Commissioners approved an Ordinance which adopted the 2018 International Fire Code with local amendments for Clark County and adopting a new fee schedule. The new code is effective as of February 6, 2019. The new ordinance is available here.
Note: Copies of the following codes are available for purchase from www.iccsafe.org, www.nfpa.org/NEC & www.iapmo.org
- 2008 Amusement and Transportation Code - Signed
- 2017 National Electrical Code
- 2018 Building Administrative Code of Clark County
- 2018 International Building Code
- 2018 International Existing Building Code
- 2018 International Residential Code
- 2018 International Swimming Pool and Spa Code
- 2018 Uniform Mechanical Code
- 2018 Uniform Plumbing Code
- 2021 International Energy Conservation Code
- 2017 National Electrical Code(NEC) Amendments
- 2017 National Electrical Code(NEC) Southern Nevada Amendments
- 2018 International Building Code(IBC) Amendments
- 2018 International Building Code(IBC) Southern Nevada Amendments
- 2018 International Existing Building Code(IEBC) Amendments
- 2018 International Residential Code(IRC) Amendments
- 2018 International Swimming Pool and Spa Code(ISPSC) Amendments
- 2018 Uniform Mechanical Code(UMC) Amendments
- 2018 Uniform Plumbing Code(UPC) Amendments
- 2018 Uniform Plumbing Code(UPC) Southern Nevada Amendments
- 2021 International Energy Conservation Code (IECC) Southern Nevada Amendments
- Accessory Assembly Spaces/Minimum Plumbing Fixtures BP-CI-033 Effective Date 07/10/2009
- Anchor Bolts In Light-Frame Construction BD-CI-038 Effective Date 09/13/2011
- Cable Rail BD-CI-047 Effective Date 03/22/2019
- Carbon Monoxide Sensors BD-CI-001 Effective Date 05/01/2007
- CMU Fence and Retaining Walls, BD-CI-220, Eff: 03/04/2021
- Concrete Exposed to Sulfate-Containing Soils BE-CI-002 Effective Date 05/01/2007
- Concrete Tilt-Up, BD-CI-221, Effective 01/01/2021
- Construction Trailers BD-CI-246 Effective 05/19/2025
- Decay Resistant Wood BD-CI-207 Effective Date 01/01/2021
- Design and Special Inspection of Signs BD-CI-208 Revised 03-21-22
- Electrical Power for Air Compressors Connected to Dry-Pipe Sprinkler Systems FP-CI-045 Effective Date 10/14/2014
- Exit Signs BD-CI-009 Effective Date 05/01/2007
- Exiting Through a Warehouse/Storeroom BP-CI-010 Effective Date 05/01/2007
- Exterior Wall Fire Separation Distance Measurement BD-CI-036 Effective Date 04/14/2011
- Exterior Wall Fire Separation Distance Measurement BD-CI-036 Effective Date 04/14/2011
- Fence Permits BD-CI-044 Effective Date 05/01/2014
- Guardrails for Elevated Spas and Walking Surfaces BP-CI-012 Effective Date 05/01/2007
- Handicap Faucets BP-CI-013 Effective Date 05/01/2007
- Indirect Waste for Food Establishments BD-CI-014 Effective Date `05/01/2007
- Interior Non-Bearing Masonry Wall Special Inspection BD-CI-210 Effective Date 01/01/2021
- Log Wall Thermal Insulation Values BP-CI-015 Effective Date 05/01/2007
- Medical Marijuana Establishments BD-CI-046 Effective Date 12/02/2014
- Mount Charleston Special Conditions BD-CI-209 Effective Date 01/01/2021
- Non-Metallic Piping/Conduit in Type I or Type II Buildings BP-CI-034 Effective Date 06/01/2009
- Palapa Shade Structures BP-CI-017 Effective Date 05/01/2007
- Plastic Cement for Use in Masonry Mortar BD-CI-018 Effective Date 05/01/2007
- Post-Installed Anchor Special Inspection for Patio Covers, BD-CI-216, 02/01/2021
- Proprietary Modular Concrete Block Retaining Wall, BD-CI-211, Effective 01/01/2021
- Protection Between Exterior Curtain Walls and Floor/Ceiling Assemblies BD-CI-005 Effective Date 04/30/2008
- Receptacles, Show Window BP-CI-021 Effective Date 05/01/2007
- Residential Facilities for Groups FP-CI-043 Effective Date 05/02/2014
- Roof Live Load for Primary Roof Members Exposed to a Work Floor BD-CI-205, Effective 03-17-20
- S-1 & S-2 Accessory Storage Buildings Minimum Number of Plumbing Fixtures BP-CI-022 Effective Date 02/13/2008
- Sill Anchorage BD-CI-039 Effective Date 09/13/11
- Single Family Residential Occupied Roof Design Live Load BD-CI-230, Effective 06/01/22
- Soil Lateral Loads, BD-CI-212, Effective 01/01/2021
- Special Inspection for Residential Construction, BD-CI-213, Effective 01/01/2021
- Structural Steel Identification, BD-CI-214, Effective 01/01/2021
- Sumps and Receiving Tanks BP-CI-030 Effective Date 05/01/2007
- Temporary Entrance Units FP-CI-048 Effective Date 06/08/15
- Toilet Facilities Accessibility BP-CI-032 Effective Date 05/01/2007
- Building (Guidelines)
- TG-01 Preparation of a Quality Systems Manual for a Structural Steel Fabricators Effective Date 05/10/2006
- TG-02 Requirements for Approval as a Clark County Building Department Structural Steel Fabricator/Manufacturer Effective Date 07/01/2009
- TG-03 Requirements for Performing Clark County Building Division Required Fabrication Facility Audits, Inspections and Nondestructive Testing of Structural Steel Effective Date 07/01/2009
- TG-05 Requirements for Approval as a Clark County Department of Development Services - Building Division Amusement and/or Transportation System Fabricator/Manufacturer Effective Date 05/07/2010
- TG-10 Structural Observation 01/02/2020
- TG-100 Quality Assurance Agency Conflict of Interest Provisions Effective Date 07/11/2016
- TG-11 Approval Process for Engineered Wood Products Effective Date 12/22/2014
- TG-12 Manufactured Engineered Metal Plate Connected Wood Truss Submittal and Review Requirements for Structures that have a Licensed Building Designer Effective Date 09/02/2016
- TG-12h Manufactured Engineered Metal Plate Connected Wood Truss Submittal and Review Requirements for Homeowner-Permittee Structures Effective Date 01/31/2005
- TG-15 Quality Systems Manual Effective Date 11/15/2023
- TG-16 Inspection Agency Obligations, Revised 06/08/2022
- TG-17 Minimum Approval Criteria for Quality Personnel (Eff 02-08-2024)
- TG-19 Approved Chemical Test Methods of Soils and Reporting Criteria Effective Date 07/20/2007
- TG-20 Quality Assurance Agency Responsibilities Effective Date 03/27/2017
- TG-200 Peer Review of Construction Documents & As-Built Conditions Effective Date 06/15/2023
- TG-22 Procedure to Condition, Suspend, Revoke, or Restore Approval of Special Inspection Personnel, Quality Assurance Agency, and Fabricator/Manufacturer Effective Date 04/29/2011
- TG-220 Plan Review by Inspector (PRBI) Effective Date 06/26/2014
- TG-30 Life Safety Systems Testing Effective Date 11/01/2011
- TG-42 Approved Concrete Suppliers Effective Date 03/15/2010
- TG-49 Pre-Construction Procedure Effective Date 06/07/2023
- TG-50 Final Report Requirements (Eff 04-1-24, Revised 01-24-24)
- TG-60 IBC Smoke Control and Related Topics Effective Date 01/01/2008
- TG-701-2023 Permit Now Program Effective 06/20/2023
- TG-702-2024 Customer Driven Consultant Services Plan Review Program Effective Date 07/30/2024
- TG-703-2023 Permit Now Program Audits Effective 7/17/2023
- TG-75 Storage Racks Effective Date 09/05/2016
- TG-80 Special Inspection Agreement Agency Change Effective Date 9/08/2017
- TG-90 Electrical Testing Services Effective Date 07/31/2023
- TG-92 System Commissioning Effective Date 07/01/2014
- TG-95 Energy Efficiency Testing Services Effective Date 05/15/2011
- How-To-Guides (BPG's)
- BPG-002 Alternate Materials & Methods of Construction Effective Date 02-16-2017.pdf
- BPG-003 Amusement & Transportation System Building Permit Guide Effective Date 02-16-2017.pdf
- BPG-021 Combined Board of Building Appeals Guidelines for Preparing Appeals Effective Date 02-16-2017.pdf
- BPG-022 Combined Board of Building Appeals Guideline Effective Date 02-16-2017.pdf
- BPG-023 Tenant Improvement for Commercial Building Effective Date 02-16-2017.pdf
- BPG-024 Commercial , Industrial & Multi- Family Development Effective Date 02-16-2017.pdf
- BPG-025 Complex Facilities Effective Date 02-16-2017.pdf
- BPG-026 Conversion of Single Family Dwelling to Office Building Effective Date 02-16-2017.pdf
- BPG-043 Engineered Wood Trusses Effective Dates 02-16-2017.pdf
- BPG-052 Fire Protection Report Design Effective Date 02-16-2017.pdf
- BPG-053 Fire Proofing for Steel Construction Effective Date 02-16-2017.pdf
- BPG-061 Grading in Conjunction with a Residential Subdivision or Parcel Map Effective Date 02-16-2017.pdf
- BPG-062 Grading Permit Effective Date 02-16-2017.pdf
- BPG-063 Natural Gas & LPG Testing Requirements Effective Date 02-16-2017.pdf
- BPG-082 In-Facility Plan Review Effective Date 02-17-2017.pdf
- BPG-083 Implosion Demolition Effective Date 02-17-2017.pdf
- BPG-120 Manufactured Building on Commercial Property Effective 02-17-2017
- BPG-121 Master Egress Plan Effective Date 02-17-2017.pdf
- BPG-122 Mobile Home Conversion from Personal to Real Property Effective Date 02-17-2017 .pdf
- BPG-123 Estates and Privately Deeded Property Effective Date 02-17-2017.pdf
- BPG-124 Mobile Home Park Effective Date 02-17-2017.pdf
- BPG-125 Modular Building as a Single Family Residence Effective Date 02-17-2017.pdf
- BPG-126 Moved Residential Building Effective Date 02-17-2017.pdf
- BPG-131 25 Decibel Level Reduction Standard Effective Date 02-17-2017.pdf
- BPG-132 30 Decibel Level Reduction Standard Effective Date 02-17-2017.pdf
- BPG-133 35 Decibel Level Reduction Standard Effective Date 02-17-2017.pdf
- BPG-152 Phased Design Buildings Effective Date 02-17-2017.pdf
- BPG-153 Plumbing License Requirements Effective Date 02-17-2017.pdf
- BPG-154 Plumbing Service & Repair - No Permit Required Effective Date 02-17-2017.pdf
- BPG-155 Post Construction Permits Effective Date 02-17-2017.pdf
- BPG-161 Quality Assurance Agency Selection Effective Date 02-17-2017.pdf
- BPG-171 Reciprocal Easement Agreement Effective Date 02-17-2017.pdf
- BPG-172 Residential Room Additions Effective Date 02-17-2017.pdf
- BPG-173 Residential Homeowner Guideline for Final Inspections Effective Date 02-17-2017.pdf
- BPG-181 Shell Building Effective Date 04-21-2023.pdf
- BPG-182 Single Family Residence & Guest House Effective Date 04-21-2023.pdf
- BPG-184 Load Bearing and Non-Load Bearing Straw Bale Construction Effective Date 02-17-2017.pdf
- BPG-185 Swimming Pool-Spa and Water Feature Effective Date 02-17-2017.pdf
- BPG-186 Standard Plan Process for Residential Development Effective Date 02-17-2017.pdf
- BPG-188 Spray Finishing Operations Effective Date 02-17-2017.pdf
- BPG-192 Temporary Off-Premise for Sale Effective Date 02-17-2017.pdf
- BPG-201 Unique Interiors Effective Date 02-17-2017.pdf
- BPG-202 Vehicle Body Shop Effective Date 02-17-2017.pdf
- BPG-216 Wind Generators Effective Date 02-17-2017.pdf
- BPG-232 Fence and Block Wall - Revised 10-04-22
- BPG-235 DAIR Building Permit Guide 07.10.2024.pdf
- BPG-238 Temporary Power Poles.pdf
- BPG-239 Express Plan Review Guide Effective Date 12-01-23 .pdf
- BPG-240 Annual Facility Permit
- Building
- FIG-B-001 2018 International Building Code Table, (revised 11/21)
- FIG-B-002 Model Home Sales Office Conversion, (revised 11/21)
- FIG-B-003 Sunken Areas in Residential Yards (Pits), (revised 11/21)
- FIG-B-004 Projects with QAA Contracts, (revised 11/21)
- FIG-B-005 Acoustic Tile Grid Ceiling Requirements, (revised 11/21)
- FIG-B-006 Manufactured Housing for Temporary Residence During Construction, (revised 11/21)
- FIG-B-007 Repair of Fire Assemblies, (revised 11/21)
- FIG-B-008 Levels of Occupancy for New Building, (revised 11/21)
- FIG-B-009 Solar Field Plan Review-Inspection, (revised 11/21)
- FIG-B-010 Building Field Inspection Service Goal, (revised 11/21)
- Electrical
- FIG-E-001 2017 National Electrical Code Table, (revised 11/21)
- FIG-E-002 Listing Labeling, (revised 11/21)
- FIG-E-003 Bonding of Swimming Pool Panels, (revised 11/21)
- FIG-E-004 Generators, (revised 11/21)
- FIG-E-005 AFCI Breakers, (revised 11/21)
- FIG-E-006 Foreign System, (revised 11/21)
- FIG-E-007 Temporary Electrical Power, (revised 05/08/2024)
- FIG-E-008 Appliances Not Required to be Installed at Final Inspections, (revised 11/21)
- FIG-E-009 Working Clearance, (revised 11/21)
- FIG-E-010 Quality Assurance Agency-Electrical Testing, (revised 11/21)
- FIG-E-011 Show Window Receptacles, (revised 11/21)
- FIG-E-012 NV Energy Requirements, (revised 11/21)
- FIG-E-013 Auxiliary Gutters, (revised 11/21)
- FIG-E-014 Receptacle Outlet for Equipment-Appliance, (revised 11/21)
- Mechanical
- FIG-M-001 2018 Uniform Mechanical Code Table, (revised 11/21)
- FIG-M-002 Duct Detector Testing, (revised 11/21)
- FIG-M-003 Review & Performance Test-Certification, (revised 11/21)
- FIG-M-004 Fire Damper Access with Flexible Duct, (revised 11/21)
- FIG-M-005 Exhaust Grease Duct Testing for Type I Hoods, (revised 11/21)
- Plumbing
- FIG-P-001 2018 Uniform Plumbing Code Table, (revised 07/23)
- FIG-P-002 Liquid Petroleum, (revised 11/21)
- FIG-P-003 Combustion Air in Garage, (revised 11/21)
- FIG-P-004 Saddles Installed in Existing Sewers, (revised 11/21)
- FIG-P-005 Thermal Expansion Control, (revised 11/21)
- FIG-P-006 Flat Venting, (revised 11/21)
- FIG-P-007 Sumps, Ejectors, and Receiving Tanks, (revised 11/21)
- FIG-P-008 Soil and Waste Lines Above Food Preparation Areas, (revised 11/21)
- FIG-P-009 Onsite Building Sewer Test, (revised11/21)
- FIG-P-010 Water Supply Tracer Wire, (revised 11/21)
- FIG-P-011 Water Softener Shutoff Valve, (revised 07/23)
- Above Code Energy Audit Reports BD-PP-137 2012 BD-PP-137,
- Assistance For Correction Notices And Notices Of Violation Resolution BD-PP-054 , Effective Date 05/01/2007
- Authorization For Temporary Residential Power At Slab BD-PP-086 , Effective Date 05/01/2007
- Auto Body Shops With Spray Booths Plan Review Policy BP-PP-047 , Effective Date 07/15/2008
- Building Inspection Clearances FPB-PP-147 , Effective Date 09/01/2013
- Business License Process FPB-PP-148 , Effective Date 09/09/2013
- Change In Occupancy BD-PP-116 , Effective Date 06/01/2009
- Clark County Soils Maps BD-PP-228
- Code Adoption Dates & Ordinances BD-PP-050 , Effective Date 12/16/2024
- Commercial/Industrial Land Attached and Air Space Only Subdivision Certification Reviews BP-PP-051 , Effective Date 10/01/2007
- Complaint Receipt and Response DEPT-PP-233 Effective Date 05/01/2023
- Concrete Mix Designs BD-PP-223 01/01/2021
- Conduit Only Permits For Fire Alarm Systems BP-PP-053 , Effective Date 07/15/2008
- Deferred Plan Submittal Requirements BD-PP-219 01/01/2021
- Definition Of "Commercial Short" Work Description BP-PP-056 , Effective Date 05/01/2007
- Demolition Permits BD-PP-142 , Effective Date 01/17/2013
- Document Approval Marking BP-PP-057 , Effective Date 05/01/2007
- Early Grading Permit BD-PP-135 , Effective Date 01/02/2018
- Electrical Meter At Slab For Tract Homes BD-PP-086 , Effective Date 05/01/2007
- Electrical Permits For Water Wells BP-PP-059 , Effective Date 05/01/2007
- Emergency Responder Radio Coverage System BD-PP-241
- Engineered Wood Trusses and Steel Joists BD-PP-217 1/01/2021
- Evaluation Service Reports BD-PP-226
- Expiration Of Plan Submittals And Approved Plans AD-PP-016 , Effective Date 03/23/200
- Express Plan Review BP-PP-062 , Effective Date 05/01/2007
- Exterior Insulation and Finish Systems (EIFS) Plan Review Procedures BP-PP-122 , Effective Date 03/15/2010
- Final Report Reviews BE-PP-132 Effective Date 01/03/2011
- Fire Alarm/Monitoring Building Permits BP-PP-063 , Effective Date 02/25/2008
- Fire Penetration Submittals BD-PP-204 6-25-2024
- Fire Protection Reports For Tenant Improvements BP-PP-064 , Effective Date 05/01/2007
- Fire-Resistant Penetration and Joint Requirements BD-PP-151 , Effective Date 12/05/2014
- Fireproofing Plans For Steel Construction BP-PP-065 , Effective Date 05/01/2007
- Floor Sink Assembly BD-PP-140 , Effective Date 04/19/2012
- Landscape Plans BD-PP-069 , Effective Date 05/01/2007
- Master Exit Plan BP-PP-070 , Effective Date 05/01/2007
- McCarran International Airport Plans BP-PP-071 , Effective Date 05/01/2007
- Minimum Exploration Requirements BD-PP-225, 09/14/2021
- Natural Gas Pipe Sizing BP-PP-072 , Effective Date 05/01/2007
- Paint Spray Booths BP-PP-075 , Effective Date 05/01/2007
- Pedestrian Protection BD-PP-224 01/01/2021
- Permit Renewal Policy BP-PP-146 , Effective Date 07/01/2013
- Personal Protective Equipment (PPE)-Mandatory Use BD-PP-126 , Effective Date 09/20/2010
- Post-Tensioned Slab on Grade BD-PP-218 01/01/2021
- Quality Assurance Plan FP-PP-150 , Effective Date 09/17/2015
- Quality Assurance Program FP-PP-149 , Effective Date 09/17/2015
- Quality Assurance Review (Contracted Services) BD-PP-080 , Effective Date 09/28/2007
- Quality Control Reviews BD-PP-081 , Effective Date 05/01/2007
- Required Meetings With Design Professionals BD-PP-243 (2025)
- Resident Inspection Program BD-PP-128 , Effective Date 09/03/2010
- Residential Standard Plan Submittals BD-PP-155 , Effective Date 10/01/2014
- Resort Inspections Program BD-PP-119 , Effective Date 11/16/2011
- Shell Buildings, Certificate of Completion BP-PP-048 , Effective Date 05/01/2007
- SNOBO Flagpole Standard
- SNOBO Food Service Establishment Submittal Checklist
- SNOBO Structural Analysis and Construction of Rockery Walls
- Solar Photovoltaic Requirements BD-PP-206 revised 6-25-2024.pdf
- Special Inspection - Audit Process BD-PP-144 , Effective Date 01/17/2013
- Special Inspection / Structural Observation BD-PP-143 , Effective Date 01/17/2013
- Stockpile Permit BD-PP-203, Revised 08-16-19
- Storm Water Inspection Procedure BD-PP-123 , Effective Date 03/15/2010
- Streetlight Pole Design Requirements BD-PP-215 01/01/2021
- Strobe Installation Requirements During Alterations To Existing Spaces BP-PP-084 , Effective Date 08/27/2008
- Structural Inspections Service Goals BD-PP-227
- Subsurface Drainage Systems BD-PP-222 01/01/2021
- Thresholds For Electrically Engineered Designs BD-PP-234
- Type I Hoods & Fire Sprinklers - H.T.E. Structure Setup BP-PP-088 , Effective Date 05/01/2007
- Utility Service Authorization For Residential Electrical & Gas Services BI-PP-025 , Effective Date 06/11/2007
- 2000 Southern Nevada IBC Code Amendments
- 2000 Southern Nevada IRC Code Amendments
- 2000 Southern Nevada UMC Code Amendments
- 2000 Southern Nevada UPC Code Amendments
- 2002 Southern Nevada NEC Code Amendments
- 2003 Southern Nevada Pool Code
- 2005 Building Administrative Code of Clark County
- 2005 National Electrical Code (NFC) Final Approved Amendments
- 2006 International Building Code (IBC) Approved Amendments
- 2006 International Energy Conservation Code (IECC) Final Approved Amendments.pdf
- 2006 International Residential Code (IRC) Final Approved Amendments
- 2006 Swimming Pool Code Final Approved Amendments
- 2006 Uniform Mechanical Code (UMC) Final Approved Amendments
- 2006 Uniform Plumbing Code (UPC) Final Approved Amendments
- 2008 Building Administrative Code of Clark County
- 2008 National Electrical Code (NFC) Approved Amendments
- 2009 Clark County Fire Code Amendments
- 2009 International Building Code (IBC) Approved Amendments
- 2009 International Energy Conservation Code (IECC) Approved Amendments
- 2009 International Fire Code
- 2009 International Residential Code (IRC) Approved Amendments
- 2009 Southern Nevada Pool Code Approved Amendments
- 2009 Uniform Plumbing & Mechanical Code
- 2010 Building Admin Code of Clark County with the Grading Amendments
- 2012 Clark County Fire Code Amendments
- 2012 International Building Code (IBC) Amendments
- 2012 International Energy Conservation Code (IECC) Amendments
- 2012 International Residential Code (IRC) Amendments
- 2012 International Swimming Pool and Spa Code (ISPSC) Amendments.pdf
- 2012 Uniform Mechanical Code (UMC) Amendments
- 2012 Uniform Plumbing Code (UPC) Amendments
- 2014 Building Administrative Code of Clark County
- 2018 IECC Amendments.pdf
- 2018 International Energy Conservation Code
- TG-702-2023
- Southern Nevada Building Officials (SNBO)
- Building
- Engineering
- Form802 Structural Observation Report
- Form803 Project Start-Up Notification of Special Inspections
- Form811 Adhesive Anchorage RodsBolts Report
- Form812 Concrete Mix Design Review Checklist
- Form818A Post-Tensioned Slab Clearance Procedure
- Form818B Post-Tensioned Slab Report
- Form822 Technical Guideline Acknowledgment
- Form829 Welder Qualification Record
- Form830 Guidelines for Preparing Special Inspection Procedures
- Form832 Concrete Supplier Audit Form
- Form835 Engineering Management Audit
- Form851 Post-Installed Mechanical Anchorage Clearance Report
- Form852 AmusementTransportation System FabricatorManufacturer Application
- Form868 Subcontracting QAA Services
- NCR Weekly Log - TG-49 Appendix C - Form 887
- Inspections
- Appliance Responsibility Agreement, Form 901, (revised 02/23)
- Authorization for Temporary Power Through the Meter, Form 160-1, (revised 05/08/2024)
- Board, Commission or Committee Application
- Combustion Air Calculation Worksheet (revised 02/23)
- Damage Assessment Request, Form 110F, (revised 06.25.2024)
- Drainage Compliance Report, Form 839, (revised 07.24)
- Duct/Area Detector Test Data, Form 209, (revised 08/23/23)
- Finished Floor Elevation Certificate (revised 2/23)
- Inspection Services Receipt, Form 310, (revised 08/23/23)
- Kitchen Hood Test Data, Form 1010, (revised 08/23/23)
- Landscape Certificate Form
- Second Opinion Form - Inspections, (revised 02/23)
- Temporary Certification of Occupancy Application (revised 02/23)
- Permit Issuance
- Plan Review
- e-Plan Revision Form.pdf
- Electrical Services Calculation Worksheet - Residential.pdf
- Form 1001 Request For Code Interpretation.pdf
- Form 1002 Air Space Only CommercialIndustrial Subdivision Certification.pdf
- Form 1003 Alternate Materials and Methods Request.pdf
- Form 1004 Electrical Service Calculation Worksheet-Residential.pdf
- Form 1007 Express Plan Review Program Application.pdf
- Form 1008 In-Facility Plan Review Agreement.pdf
- Form 1009 In-Facility Services Receipt.pdf
- Form 1010 Kitchen Hood Test Data.pdf
- Form 1011 Letter Of Understanding, Requirements For Major Structures.pdf
- Form 1012 Phased Design Application.pdf
- Form 1013 Phased Design Schedule.pdf
- Form 1015 Pre-Submittal Meeting Information Form.pdf
- Form 1016 R-Values For Framed Assemblies.pdf
- Form 1017 Hourly Plan Review Application Form
- Form 1018 Land Attached CommercialIndustrial Subdivision Certification.pdf
- Form 1021 Building Short Log Check-In.pdf
- Form 2000 Accessory Apartment Deed Restriction.pdf
- Form 901 Appliance Responsibility Agreement. (revised 02/23)
- Form209 Duct Area Detector Test Data.pdf
- Occupancy Checklist for Typical Commercial Projects.pdf
- Plan Submittal
- Records
- Planning
- Customer Survey
- Electronic Plan Submittal Knowledge Base